Interconnection of the new Ultra-High Voltage Centre in Kozani

Share:

Interconnection of the new Ultra-High Voltage Centre in Kozani

Requirements

The Project involves the interconnection of the new 400kV Ultra-High Voltage Centre (Greek abbreviation KYT) in KOZANI with the existing ultra-high voltage transmission line passing above it.

Client

ATERMON - KIEFFER

ATERMON - KIEFFER

atermon.com.gr
, kiefer.gr
Operating Voltage

400 kV

Operating Voltage

The Challenge

Our company was commissioned to prepare a study based on the already existing approved preliminary design. Although there was very little room for modifications, we were called to resolve some technical issues.

The Solution

Despite the technical problems that arose, we submitted to the customer three (3) alternative solution options for the execution of the Final Design.

Related Services

  • Final Design to be approved by IPTO

The customer received the Final Interconnection Design which presents the fewest technical problems, given the binding nature of the original design.

  • Starting Date

    May 2022

  • Project Completion

    July 2022

  • Industry

    Power plant development companies

We are trusted

Terna energeiaki
Iberdrola
Copezouzos group
Innovative power
Motor oil
Edf
Intrakat
Kiefer
Enteka
Ventus ate
Protasis
Maximus terra
Hlmekat
Atermon
Alternus
Afcon

Talk to
our engineers today!