Interconnection of Photovoltaic Power Plant in Drepano, Kozani

Share:

Interconnection of Photovoltaic Power Plant in Drepano, Kozani

Requirements

The interconnection of the 100 MW photovoltaic power plant in Kozani, near the village of Drepano with the 400 kV Greek grid incorporates an MV/400 kV substation and a 400kV extra high voltage transmission line.

Client

LUX NORTH GREECE


Substation and extra high voltage transmission line

400 kV

Substation and extra high voltage transmission line

Challenges

Spatial Restrictions: The site is located in close proximity to the villages of Drepano and Galani, which limits the options for the development of the EHVSS. Distance restrictions from residential areas had to be taken into account to minimise visual and acoustic impact.


Existence of Infrastructure: There are underground oil pipelines and existing transmission lines in the area, which necessitated a detailed analysis to avoid overlap and risks during the development of the EHVSS and the new EHV transmission line.

How the project will be completed

Site assessment for the MV/400kV Substation: Initially, an analysis of the area was carried out with detailed surveys and geophysical studies. These studies identified the most suitable locations for the EHVSS, taking into account the proximity to populated areas, existing infrastructure and environmental conditions.


Collaboration with Local Authorities: In order to ensure compliance with local regulatory requirements, meetings were held with local authorities and competent bodies. This facilitated an understanding of local needs and constraints and ensured support for the project implementation.

Related Services

  • Preliminary suitability studies for the MV/400kV Substation & 400kV transmission line to be approved by IPTO.
  • Design of the 400kV HV overhead transmission line for use in the Environmental Impact Assessment (EIA).
  • Final design of the 400kV HV overhead transmission line to be approved by IPTO.

The client received an optimized interconnection study ensuring seamless and safe energy transfer. Careful siting has minimized environmental impacts and strengthened social acceptance, while proper preparation has limited delays and additional costs.

  • Starting Date

    March 2023

  • Project Completion

    ongoing

  • Industry

    Power plant development companies

We are trusted

Terna energeiaki
Iberdrola
Copezouzos group
Innovative power
Motor oil
Edf
Intrakat
Kiefer
Enteka
Ventus ate
Protasis
Maximus terra
Hlmekat
Atermon
Alternus
Afcon

Talk to
our engineers today!