Requirements
The project concerns the interconnection of the 38 MW “Skiadovouni” Wind Farm in the area of Skiadas, Achaia Prefecture, with the HETS system.
Client
PROTASIS
protasis.net.gr11 km
150kV Overhead Transmission Line
The Challenge
The local terrain morphology, coupled with the existence of numerous private properties, increases the degree of difficulty in choosing an optimal route for the overhead line.
The Solution
The layout of the route of the overhead line was decided after using topographic data from a LiDAR point cloud due to the dense vegetation cover in the area. This method minimises siting mistakes due to incorrect topographic data.
Related Services
- Preliminary design of an overhead line for suitability approval by IPTO
- Study of an overhead line for use in the Environmental Impact Assessment (EIA)
- Final design of the overhead transmission line to be approved by IPTO
The customer received the wind farm interconnection plans, knowing that they constituted a flawless, reliable and highly cost-effective solution.
Starting Date
July 2021
Project Completion
August 2022