150 kV Transmission Line in Kafireas, Evia

Share:

150 kV Transmission Line in Kafireas, Evia

Requirements

Installed in the Municipality of Karystos, Evia, this complex is the largest wind farm in Greece, consisting of 7 wind farms with a total installed power of 154 MW.

Client

150kV Overhead Transmission Line (special design)

2 km

150kV Overhead Transmission Line (special design)

The Challenge

Due to the high wind pressure in the area, studies had to be carried out regarding the wind load on the overhead line, as well as regarding the line’s mechanical strength.

The Solution

The results of the measurements indicated high stress on the lattices of the line, which led us to select pylons of higher mechanical strength.

Related Services

  • Preliminary design of an overhead line for approval by IPTO
  • Final Design of an overhead line to be approved by IPTO

Using the Final Design, the customer will construct an overhead line that will be able to withstand the adverse weather conditions of southern Evia.

  • Starting Date

    April 2020

  • Project Completion

    December 2021

  • Industry

    Power plant development companies

We are trusted

Terna energeiaki
Iberdrola
Copezouzos group
Innovative power
Motor oil
Edf
Intrakat
Kiefer
Enteka
Ventus ate
Protasis
Maximus terra
Hlmekat
Atermon
Alternus
Afcon

Talk to
our engineers today!